View as Markdown (for AI/KB) Whole knowledge base (llms.txt)
When a design goes to manufacturing you want to be able to show which take was actually built, and to catch an export made after the review. You do that with release and the fab package.
Mark a take as released or ordered
You record that a take was released for manufacturing or ordered, with a date and a fab/order reference. Then everyone knows which version is as-built — not just which was last reviewed.
Copper changed after release
If copper changes after a take has been released, Probe raises it (the rule for copper changed after release). A late layout change on an already-released take is exactly the kind of thing that needs to be visible.
Upload the fab package
The fab package (Gerber, drill, IPC-D-356) is uploaded over the API — the server can’t see your disk. The upload recipe is in the ingest information, with an upload ticket for the upload routes only.
Confirm the layer mapping
When the package has come in, you confirm or correct its layer mapping, so Probe’s layers match the shop’s. After that you can read the comparison between the fab package and the reviewed design.
Related: boards, takes and the design line and compare takes.
Probe is E-Sharp’s design-review engine. A report always carries which board and which take it applies to.